Profile of the Company: 1. Company Background: - We wish to introduce ourselves as an organisation catering to variety of engineering fields such as Rehabilitation and repairs of structures such as bridges, dams, industrial structures, water retaining structures jetties, under water repairs of foundations, and carrying out pile foundation and construction of minor bridges etc. TECH-FAST REBUILD is managed by a group of having wide expertise in similar field for more than three decades by virtue of their previous employments/assignments. The undersigned in the capacity as a partner of an organisation having executed the many similar nature of works involving underwater activities for repair of concrete pile is submitted below with brief case study for the project executed. Fortunately the undersigned was very much instrumental in this organisation i.e. from founding of this firm to his personal involvement as an expertise member of the team involved in preparing scheme for under water pile repair and mainly through out execution of all difficult/critical activities and have the honour of successfully completing the project. The brief case study of the project is as under Name of Client: Power grid Corporation Nature of work: Under water repairs to pile foundation for transmission line Tower foundation at Rajahmundry in main stream of Godavari River. Nature of damages: The two foundation of existing transmission towers situated in the mid stream of Godavari river crossing Scheme for Repairs/Strengthening:- We inspected the piles with the help of divers and prepared the detailed under water inspection report. Based on these reports a detailed scheme for strengthening was prepared and worked out. A new special technique of constructing enclosure around piles by using well designed steel chamber was introduced. The steel chambers were designed considering underwater pressure to act as a coffer dam. These steel chamber were fabricated on the shore and then transported to Tower location with dumb barges. The chambers were lowered by using heavy lifting tools and the highly skilled technicians and manpowers. The whole team was supported by a highly qualified team of divers to tackled all underwater activities at all times. The steel chambers were lowered to the required bed level of about 10-12 mtr. In 2 segments. The divers were used to guide the steel chambers and then fix it around the existing piles. The steel chambers were designed to ensure a clear working space of about 1 mtr all around was created. Accordingly, the chambers were fixed and scaled thoroughly at all joints and the bed level by using an underwater products and technique. After the steel cages were sealed. The dewatering was done in the steel chambers and the steel chambers were emptied and made dry Once the steel chambers were dried up. The easy access was made inside the steel chambers and all the further strengthening of damaged piles was begin to a depth of almost 10-12 mtr.. Accordingly the further activities as done on ground was done like, a) Chipping of loose concrete. b) Applying Anticorrosive to existing reinforcement. c) Placing new reinforcement wherever required. d) Placing steel shutters up to bed level of piles all around. e) Pouring of ready mix normal concrete in the shutters. One completion of pouring of micro concrete. The shuttering were left as sacrificial and later on the steel chambers lowered around the piles underwater to act as coffer dam were taken out and further all piles were strengthened. This special technique of strengthening piles underwater by erecting steel chambers around piles was executed first time in our country. Mr. A. A. Kudroli was instrumental and happened to have played a role in executing such difficult projects. We are committed to provide the best engineering solutions with innovative methods. We append below a brief list of major works carried out by the company in the past. 1. Repairs to Jetties on offshore involving major structural repairs having specialised fields under MbPT. 2. Repairs to bridges under various state PWD and NHAI. 3. Rehabilitation and repairs to various distressed bridge under many zones of Railways across the country involving similar kind of work. Mr. A. A. Kudroli was instrumental in founding and managing the Company M/s. Tech Fast Rebuild Pvt. Ltd. In the year 2010. During this tenure many difficult and challenging works were successfully executed by the company. 2. Activity: - To carry on the business of rebuilding, construction, rehabilitation, renovation, repair, maintenance, comprising of major civil works and to undertake projects and contracts for any departments and authorities of government or private, either alone and jointly, civil works of all types, kinds, natures and distinction like land development, widening, paving, resurfacing, upgrading, strengthening of roads, bridges, dams, flyover, highways, tunnels, chimneys, power plants, of all types of R. C. C., and post-tensioned cement concrete works, reinforced cement concrete works, rock-cutting, reclamations, cement grouting, waterproofing work, painting, decorating and all types of pile/well foundation engineering work, interior designing and graphics, and to enter into arrangement with Central Government, State Government, Semi Government Bodies, private parties or the departments, authorities, municipal, Local or otherwise, or with any institution or company in India or abroad and to procure from such Government Authorities, departments, person, institution or company, rights of all sorts or assistance, privileges, charters, contracts, licences and concessions which the company may think it desirable. 3. Marketing Strategies: - Generally the Tender Enquiries are obtained from the market based on the information / Enquiry gathered the following are made from the Head Office. In case of Tenders the Tenders are filled accordingly the jobs are secured. After securing the jobs successfully the planning for execution is made & the necessary arrangement are made to mobilize the site with required Manpower & Equipments then the projects are handled by concern Project In-charge who reposts to the Head Office to the concerned superiors at Head Office. The required planning of Major Resources for the projects are made from the Head Office accordingly it is ensured the projects are completed with a combined Team effort within the specified Time schedule of the Contract.